-
Flood ProjectFloodplain Risk Management Study and Plan
Allans Creek Flood Study & Floodplain Risk Management Study and Plan 2024
CompletedPublication date: 14/06/2024The Allans Creek Catchment is located in the Wollongong Local Government Area (LGA). Covering an area of 45 square kilometres, the catchment is largely urbanised. Allans Creek...
-
Flood ProjectFlood study
Minnegang Creek Flood Study
CompletedPublication date: 23/10/2019The Minnegang Creek Catchment is located approximately 7km south of Wollongong. The Minnegang Creek Catchment is approximately 90 hectares in size and is largely developed and...
-
Flood ProjectFlood study
Duck Creek Flood Study
CompletedPublication date: 31/05/2019The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek catchment and establish the basis for...
-
Flood ProjectGuidance, Tools and Resources
Revised 2016 Design Rainfalls Investigations into the need for and...
CompletedPublication date: 26/07/2018In 2016, a revision of Australian Rainfall and Runoff was released with updated IFD design rainfalls. The IFDs were derived using more data and modern methods than previous...
-
Flood ProjectFloodplain Risk Management Study and Plan
Mullet and Brooks Creeks Floodplain Risk Management Study & Plan
CompletedPublication date: 01/02/2010EXECUTIVE SUMMARY Bewsher Consulting Pty Ltd was commissioned by Wollongong City Council, with financial assistance from the Department of Environment, Climate Change and Water...
-
Flood ProjectFloodplain Risk Management Study
Allans Creek Floodplain Risk Management Study (Revised)
CompletedPublication date: 01/09/2006The Allans Creek catchment has an area of 42 square kilometres. The catchment lies to the south west of the Wollongong CBD and rises up to the Illawarra escarpment. The...
-
Flood ProjectGuidance, Tools and Resources
Allans Creek Catchment - Erosion & Sedimentation Study & Riparian Lands Assessment
CompletedPublication date: 01/12/2002The Port Kembla Harbour Environment Group and Port Kembla Port Corporation have commissioned Forbes Rigby to investigate issues of sediment generation, transport and deposition,...
-
Flood ProjectFloodplain Risk Management Study
American Creek - Between Cordeaux Road and Suttor Place - Floodplain...
CompletedPublication date: 01/03/2002This report has been prepared by Lawson and Treloar for Wollongong City Council to detail floodplain management options for American Creek between Cordeaux Road and Suttor...
-
Flood ProjectPost event data collection
August 1998 Wollongong Storms
CompletedPublication date: 23/02/1999During the evening of 17 August 1998 between 1700 and 2000 Eastern Standard Time (EST) extremely heavy rainfall near the Illawarra escarpment to the northwest of Wollongong...
-
Flood ProjectGuidance, Tools and Resources
Yallah TAFE Crossing Upgrading - Investigation & Design
CompletedPublication date: 01/08/1992The catchment of Duck Creek is shown on the Locality Plan, included as Exhibit 1 . Overtopping of the access road and culvert, occurring on several occasions during the past few...
-
Flood ProjectFlood study
Little Lake Flood Study - Compendium Of Data
CompletedPublication date: 01/11/1991Little Lake (previously named Elliot Lake), is a small lake located on the South Coast of NSW approximately 15 kilometres south of the City of Wollongong, and 2 kilometres south...
-
Flood ProjectPost event data collection
Wollongong Creeks June 1991- Flood Levels Surveyed (Mullet Creek, Duck Creek...
CompletedPublication date: 01/06/1991Mullet Creek, Duck Creek & Macquarie Rivulet - Flood Levels Surveyed, June 1991 Maps and figures reporting identified flood levels
-
Flood ProjectFlood study
A Flood Study of Macquarie Rivulet
CompletedPublication date: 01/10/1988This flood study of Macquarie Rivulet involves the evaluation of peak flood discharge estimates, for various average recurrence intervals. The catchment area of the Macquarie...
-
Flood ProjectGuidance, Tools and Resources
Meteorological Aspects of an Extraordinary Flash Flood Event Near Dapto, New...
CompletedPublication date: 01/05/1985Extraordinary short-duration heavy rainfall on 18 February 1984 was found to be caused by several meso and synoptic-scale focusing mechanisms. Of particular importance was the...
-
Flood ProjectFlood study
Review of Hewitts Creek Flood Study Final Report
SupersededPublication date: 01/08/2015EXECUTIVE SUMMARY Introduction The review of Hewitts Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the...
-
Flood ProjectFlood study
Review of Towradgi Creek Flood Study
SupersededPublication date: 11/02/2015EXECUTIVE SUMMARY Introduction The review of Towradgi Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the...
-
Flood ProjectFlood study
Duck Creek Flood Study
SupersededPublication date: 15/02/2012EXECUTIVE SUMMARY Introduction The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek...
-
Flood ProjectFlood study
Fairy and Cabbage Tree Creeks Flood Study
SupersededPublication date: 04/02/2010Fairy and Cabbage Tree Creeks drain a relatively small catchment of 2074 ha or 20.74 square kilometres. The catchments of the tributary streams rise from the beach area (near...
-
Flood ProjectFlood study
Allans Creek Flood Study (Revised)
SupersededPublication date: 01/09/2006The Allans Creek catchment has an area of 42 square kilometres. The catchment lies to the south west of the Wollongong CBD and rises up to the Illawarra escarpment. The...
-
Flood ProjectFloodplain Risk Management Study and Plan
Towradgi Creek, Wollongong Floodplain Risk Management Study and Plan
SupersededPublication date: 01/06/2003The Towradgi Creek catchment drains an area of about 7.2 square kilometres through the northern Wollongong suburbs of Tarrawanna, Corrimal, Towradgi and Fernhill. The catchment...