21 Flood Projects found

Tags: Wollongong

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Allans Creek Flood Study & Floodplain Risk Management Study and Plan 2024

    Completed
    Publication date: 14/06/2024
    The Allans Creek Catchment is located in the Wollongong Local Government Area (LGA). Covering an area of 45 square kilometres, the catchment is largely urbanised. Allans Creek...

  • Flood Project
    Flood study

    Minnegang Creek Flood Study

    Completed
    Publication date: 23/10/2019
    The Minnegang Creek Catchment is located approximately 7km south of Wollongong. The Minnegang Creek Catchment is approximately 90 hectares in size and is largely developed and...

  • Flood Project
    Flood study

    Duck Creek Flood Study

    Completed
    Publication date: 31/05/2019
    The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek catchment and establish the basis for...

  • Flood Project
    Guidance, Tools and Resources

    Revised 2016 Design Rainfalls Investigations into the need for and...

    Completed
    Publication date: 26/07/2018
    In 2016, a revision of Australian Rainfall and Runoff was released with updated IFD design rainfalls. The IFDs were derived using more data and modern methods than previous...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Mullet and Brooks Creeks Floodplain Risk Management Study & Plan

    Completed
    Publication date: 01/02/2010
    EXECUTIVE SUMMARY Bewsher Consulting Pty Ltd was commissioned by Wollongong City Council, with financial assistance from the Department of Environment, Climate Change and Water...

  • Flood Project
    Floodplain Risk Management Study

    Allans Creek Floodplain Risk Management Study (Revised)

    Completed
    Publication date: 01/09/2006
    The Allans Creek catchment has an area of 42 square kilometres. The catchment lies to the south west of the Wollongong CBD and rises up to the Illawarra escarpment. The...

  • Flood Project
    Guidance, Tools and Resources

    Allans Creek Catchment - Erosion & Sedimentation Study & Riparian Lands Assessment

    Completed
    Publication date: 01/12/2002
    The Port Kembla Harbour Environment Group and Port Kembla Port Corporation have commissioned Forbes Rigby to investigate issues of sediment generation, transport and deposition,...

  • Flood Project
    Floodplain Risk Management Study

    American Creek - Between Cordeaux Road and Suttor Place - Floodplain...

    Completed
    Publication date: 01/03/2002
    This report has been prepared by Lawson and Treloar for Wollongong City Council to detail floodplain management options for American Creek between Cordeaux Road and Suttor...

  • Flood Project
    Post event data collection

    August 1998 Wollongong Storms

    Completed
    Publication date: 23/02/1999
    During the evening of 17 August 1998 between 1700 and 2000 Eastern Standard Time (EST) extremely heavy rainfall near the Illawarra escarpment to the northwest of Wollongong...

  • Flood Project
    Guidance, Tools and Resources

    Yallah TAFE Crossing Upgrading - Investigation & Design

    Completed
    Publication date: 01/08/1992
    The catchment of Duck Creek is shown on the Locality Plan, included as Exhibit 1 . Overtopping of the access road and culvert, occurring on several occasions during the past few...

  • Flood Project
    Flood study

    Little Lake Flood Study - Compendium Of Data

    Completed
    Publication date: 01/11/1991
    Little Lake (previously named Elliot Lake), is a small lake located on the South Coast of NSW approximately 15 kilometres south of the City of Wollongong, and 2 kilometres south...

  • Flood Project
    Post event data collection

    Wollongong Creeks June 1991- Flood Levels Surveyed (Mullet Creek, Duck Creek...

    Completed
    Publication date: 01/06/1991
    Mullet Creek, Duck Creek & Macquarie Rivulet - Flood Levels Surveyed, June 1991 Maps and figures reporting identified flood levels

  • Flood Project
    Flood study

    A Flood Study of Macquarie Rivulet

    Completed
    Publication date: 01/10/1988
    This flood study of Macquarie Rivulet involves the evaluation of peak flood discharge estimates, for various average recurrence intervals. The catchment area of the Macquarie...

  • Flood Project
    Guidance, Tools and Resources

    Meteorological Aspects of an Extraordinary Flash Flood Event Near Dapto, New...

    Completed
    Publication date: 01/05/1985
    Extraordinary short-duration heavy rainfall on 18 February 1984 was found to be caused by several meso and synoptic-scale focusing mechanisms. Of particular importance was the...

  • Flood Project
    Flood study

    Review of Hewitts Creek Flood Study Final Report

    Superseded
    Publication date: 01/08/2015
    EXECUTIVE SUMMARY Introduction The review of Hewitts Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the...

  • Flood Project
    Flood study

    Review of Towradgi Creek Flood Study

    Superseded
    Publication date: 11/02/2015
    EXECUTIVE SUMMARY Introduction The review of Towradgi Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the...

  • Flood Project
    Flood study

    Duck Creek Flood Study

    Superseded
    Publication date: 15/02/2012
    EXECUTIVE SUMMARY Introduction The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek...

  • Flood Project
    Flood study

    Fairy and Cabbage Tree Creeks Flood Study

    Superseded
    Publication date: 04/02/2010
    Fairy and Cabbage Tree Creeks drain a relatively small catchment of 2074 ha or 20.74 square kilometres. The catchments of the tributary streams rise from the beach area (near...

  • Flood Project
    Flood study

    Allans Creek Flood Study (Revised)

    Superseded
    Publication date: 01/09/2006
    The Allans Creek catchment has an area of 42 square kilometres. The catchment lies to the south west of the Wollongong CBD and rises up to the Illawarra escarpment. The...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Towradgi Creek, Wollongong Floodplain Risk Management Study and Plan

    Superseded
    Publication date: 01/06/2003
    The Towradgi Creek catchment drains an area of about 7.2 square kilometres through the northern Wollongong suburbs of Tarrawanna, Corrimal, Towradgi and Fernhill. The catchment...