Flood ProjectFlood Warning Reports
Pending Esk River Flood Monitoring Project
CompletedPublication date: 11/03/2024Installation of a remotely monitored flood gauge on the Esk River Bridge and flood warning signs at Woombah and Iluka villages along Iluka Rd. Inclusions of flashing ‘closed’...
-
Flood ProjectFlood study
Pending Moonee Creek Flood Study 2025
DraftPublication date: 26/03/2025Moonee Creek Flood Study undertaken by JB Pacific
-
Flood ProjectFloodplain Risk Management Study
Elliott Lake Little Lake FRMSP Update
CompletedPublication date: 21/05/2025Revision to the 2016 FRMSP. Updated hydraulic model to TUFLOW. Recalibrated and validated.
-
Flood ProjectFlood study
CTP - Sydney Olympic Park Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only relate to temporary excavation for the CTP works and...
-
Flood ProjectFlood study
CTP - Burwood North Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only relate to temporary excavation for the CTP works and...
-
Flood ProjectFlood study
CTP - North Strathfield Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only relate to temporary excavation for the CTP works and...
-
Flood ProjectFlood study
CTP - Five Dock Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only relate to temporary excavation for the CTP works and...
-
Flood ProjectFlood study
CTP - The Bays Flood Data
CompletedPublication date: 23/04/2025Flood modelling data added for temporary design following the completion of the CTP package. Note these flood designs only remain valid until the follow-on contractors commence...
-
Flood ProjectFlood study
Redbank Creek Flood Study
CompletedPublication date: 17/04/2025The Redbank Creek Flood Study focuses on the Redbank Creek catchment and the township of North Richmond, located within the Hawkesbury Local Government Area (LGA), approximately...
-
Flood ProjectDam Safety Plan
Lamberts Gully REA - ID 1227 Dam Safety Emergency Plan
CompletedPublication date: 09/04/2025Annual update of Lamberts Gully REA - ID 1227 Dam Safety Emergency Plan - March 2025
-
Flood ProjectFloodplain Risk Management Study and Plan
Marulan Floodplain Risk Management Study and Plan
CompletedPublication date: 04/04/2025Hydraulics model, result, and Marulan Floodplain Risk Management Study and Draft Plan report (final version April 2025)
-
Flood ProjectDam Safety Plan
Shannon Creek Dam Safety Emergency Plan
CompletedPublication date: 28/03/2025The document covers requirements for preparedness in relation to the occurrence of an emergency condition at Shannon Creek Dam and provides information necessary for emergency...
-
Flood ProjectFloodplain Risk Management Study and Plan
Willinga Lake Flood Study and Floodplain Risk Management Study & Plan 2025
CompletedPublication date: 25/03/2025Council engaged Worley Consulting to undertake the Willinga Lake Flood Study and Floodplain Risk Management Study and Plan (FRMS&P). Willinga Lake is located within the...
-
Flood ProjectFlood study
Clyde River Flood Study and Floodplain Risk Management Study
CompletedPublication date: 19/03/2025Completion of a Flood Study and Floodplain Risk Management Study and Plan for the Clyde River wihin the Shoalhaven LGA. Hydrological and hydraulic models have been extend to the...
-
Flood ProjectFloodplain Risk Management Study and Plan
Hay and Maude Flood Study and Flood Risk Management Study and Plan
CompletedPublication date: 01/03/2025Hay Shire Council (Council) commissioned the preparation of a Flood Study and Flood Risk Management Study and Plan for the township of Hay and the village of Maude. The...
-
Flood ProjectFlood study
Coolamon Flood Study
CompletedPublication date: 01/03/2025The objective of the study was to define the nature of the following two types of flooding that are experienced at the township of Coolamon for flood frequencies ranging between...
-
Flood ProjectFlood study
Tocumwal and Barooga Flood Study
CompletedPublication date: 17/02/2025The Flood Study provides information to improve the understanding of flood behaviour and impacts in the study area, which includes the towns of Tocumwal and Barooga, as well as...
-
Flood ProjectFlood study
North Creek Warners Bay Flood Study (Final Report) January 2025
CompletedPublication date: 25/01/2025Catchment description Study Area and Catchment Details The study area comprises the entire North Creek catchment, located on the northern hinterland of Lake Macquarie. The...
-
Flood ProjectDetailed Design
Doonmore Street Retarding Basin – Investigation and Detail Design
CompletedPublication date: 08/01/2025Introduction Royal HaskoningDHV (RHDHV) was commissioned to undertake the Investigation and Detail Design for a detention basin system within Penrith on behalf of Penrith City...
-
Flood ProjectDetailed Design
St Marys Flood Protection Levee Upgrade – Investigation and Detail Design
CompletedPublication date: 31/12/2024This project is to undertake detailed investigations including detailed survey of the levee, a complete auditing of the levee to identify any structural defects including soil...